Integrating 29.97 media in 23.976 project


hi there,

 

i have project vast majority of media 23.976 fps video. however, archival clip of instrumental music performance in 29.97 fps.

 

i wondering best way integrate 29.97 media?

 

i have tried following:

  1. simply dragging 29.97 23.976 project = audio sync looks off
  2. interpreting 29.97 media 23.976 = audio slowed down, pitch lowered

 

any advice appreciated.

 

thanks!

1. simplest.  can adjust sync.



More discussions in Premiere Pro CC


adobe

Comments

Popular posts from this blog

Soustraire une selection

After Effects: could not find dvaeve_dialogs.txt

Illustrator cs6 "Invalid Serial Number"