I have footage of 29,97fps and 25fps in my video/sequence; Why is it ruining the sync?


hello.

im mad @ moment because worked hard on 1 project goes 23 minutes. problem after exporting video isnt synced timeline shows. think because have got footage of 25fps , 29,97 fps in video , cost me time change 25fps. because trimmed clips , after changing these clips's frame rates arent in correct trimmed position , speed lower. im mad right now, have got handbrake dont program, have 50+ material in video , 25 of them in 29,97 why cant render in timeline.. make thing easier. isnt there other way, making of footage in same frame rates; or making them run in timeline? have 50 clips of lowerthirds in 29,97. hope of can me because im done @ moment.

thanks reading.



More discussions in Premiere Pro CC


adobe

Comments

Popular posts from this blog

Info.Plist

Catalog issues